Tuesday, March 11, 2014

Rebuilding the Diesel Network

In Gunn's Great Mistake, I outlined what I believe was SEPTA's greatest failure during the Center City tunnel construction era--namely that, in the name of tunnel electrification, SEPTA eliminated all of its diesel commuter services. While it is fair to note that the tunnel construction itself consumed all of the agency's resources, and thus that staff wouldn't have wanted to touch diesel-network issues with a ten-foot pole, I am also certain that had there been a will, there would have been a way.

Now I want to concentrate, going forward, on the moves necessary to recreating this network.

1. Build the Swampoodle Connection. A Swampoodle Connection, in its strongest form, has multiple uses: Not only does it shunt the Chestnut Hill West Line down the Reading trunk, it also offers a grade-separated junction between the Northeast Corridor and the SEPTA mainline. This is because (incremental) construction of the Connection is, at each step, an order of magnitude less expensive than the expense needed to rehabilitate Pencoyd back to the standard necessary for active rail service.

Because of this, Swampoodle would naturally include another connection beyond the ones I previously noted, as it would need to provide the following paths:
  • NEC to SEPTA Mainline
  • NEC to R6 Line
  • Chestnut Hill West Branch to SEPTA Mainline
Of these, the first was never considered, but is not difficult to extend the design to add it in.

2. Work with NJ Transit for Newark Service. NJT's West Trenton proposal: After all, the combined SEPTA and NJT route reflects the Reading's Crusader alignment; a direct train would offer a secondary Philadelphia-New York commuter service to complement the very busy Keystone Service - Northeast Regional trains. With a high-quality Swampoodle Connection (and Kearny Connection at the other end), this would allow for regular Suburban Station-Newark Penn trains.

3. Integrate with Reading commuter rail. 'Nuff said.

4. Rebuild the Bethelehem Branch north of Shelly. Not only that, but extend it into Allentown. This would complement NJT's own Lehigh Valley designs. It would also help springboard work on the key (missing) regional connection from Philadelphia to Scranton and beyond.

5. Rebuild the Newtown Branch north of Fox Chase. 'Nuff said.

These projects--Swampoodle in the core supporting reconstructions and upgrading (return to service) of SEPTA's 1980 commuter rail network--would do more than just return our system (nearly) all the way to its Bicentennial extent, it would also offer a framework to hang more rail expansions from. For example:

6. Consider the Octoraro Branch. Kennett Square is a strong natural terminus, and the Brandywine Valley, while semi-rural, has centralized population centers. Reactivation of the Octoraro Branch, while requiring ROW reconstruction from Chadds Ford to Wawa, would also offer improved service to the Concordville/Painters Crossing/Brinton Lake area.

7. Consider the Perkiomen Branch. While the line up the Perkiomen has been abandoned for so long that the ROW has been severed in places, the region also holds several good conurbations crying out for better service: Collegeville, Schwenksville, and the Green Lane/Pennsburg/Red Hill complex, to name a few. Reclamation of this line would improve access to these towns.

8. Consider the New Hope Branch. While the line out of Ivyland runs through the at turns exurban and rural Buckingham Valley, New Hope, despite its size, offers strong destination value.

This list can be augmented until one runs out of historic easements. Pennsylvania has been blessed with a wealth of good, high-quality small towns--not all of them even near historic rail easements--and while their continued development is by no means tied to rail access, the access itself functions as an augment, offering improved transportation choices to these places. And the key is, a reborn diesel network functions as a framework for providing service to these awesome places. This is, more than anything, our ancestors' endowment to us: Isn't it time to make it be all it can be?

Monday, March 10, 2014

Gunn's Great Mistake

One of the major moves David Gunn made, while he was head of SEPTA back in the late '70s and early '80s, was the curtailment of its regional rail lines back into electrified territory, a move rail advocates have regretted ever since. The stated reason was that the new Center City Commuter Connection wouldn't allow scheduled diesel service, implicitly that the Reading Terminal was going to be closed down. But the problem is that this was a red herring: SEPTA's planners could have, with some clever easement tricks, retained diesel services into 30th Street or Suburban Stations. Below is one way I penciled out how.
That isn't to say there aren't structural weaknesses. Without a proper Swampoodle Connection, trains to Newtown and Newark (at minimum) are forced to use the freight alignment on the west side of the Schuylkill, for example; to avoid overloading this line, I use the Stony Creek Branch to bring trains out of Bethlehem into Philly via the R6 alignment. (A minor advantage of this setup is that it would have forced SEPTA to repair the Pencoyd Viaduct in 1986 instead of truncating the Ivy Ridge line back to Cynwyd.)

--The counter to this, though, is that the vehicles providing this service, Budd RDCs, were ending their design life at the time*, and their replacement, the SPV-2000, was so atrociously bad only the really clueless agencies ever ordered them.

--Countering that counter one would note that this was the era of the Comet I and the F40PH; again, had service retention been paramount, there would have been a way. But of course, all the political will of the era was focused on the tunnel, which leaves to us the task of picking up the pieces.

Wednesday, April 10, 2013

NPT Card Accessibility

Short and sweet.

Make sure there are facilities to dispense and charge NPT cards at every single subway, El, Regional Rail, NHSL, and 101/102 stop.

Make sure there are facilities to dispense and charge NPT cards at every single Subway-Surface stop in the tunnel.

Make sure there are facilities to dispense and charge NPT cards at every single Subway-Surface loop.

Make sure there are facilities to dispense and charge NPT cards at principal bus nodes--anywhere, except for Center City or on the Frankford Terminal approaches, where three or more bus routes come together. This includes Wissahickon Transfer, the Ogontz Loop, Franklin Mills, King of Prussia, Penn's Landing, Front & Market, Whitman Plaza, Andorra, Plymouth Meeting, Willow Grove, and so forth. Additionally, ensure that NPT dispensaries are available at principal jobs hubs, such as HUP.

The goal is to maximize user accessibility, maximize ease of use, maximize user confidence.

Tuesday, April 9, 2013

What Oyster Teaches Us About Fare Collection

How it's done:
SEPTA's NPT wants to act like London's Oyster Card, but with an open platform. Many Oyster best practices are thus best practices SEPTA needs to implement.

1. Tap in, tap out. SEPTA's current NPT Regional Rail policy is extremely convoluted and commuter-optimized, essentially giving free fare one way in exchange for double fare the other. Anywhere where there's a viable workaround, this will ensure overloaded trains on the free side and empty trains on the double-fare side.

Instead, Oyster uses a validator system, which is just an electronic update of a proof-of-payment system. Proof-of-payment systems are tried and tested, and are in use on the River Line and throughout the MBTA and most newer commuter-rail and light-rail networks. And best of all, they can be policed in the same manner as other proof-of-payment systems--just check and see if the card is indeed showing an active trip  being taken, and fine the holder if not--like a transit traffic ticket.

2. Guide to workarounds. Another issue NPT has is zone implementation. Annoying, but the only alternative is a per-mile fee. Instead, use an Oyster-style intrazone transfer system. On the Oyster, where route transfers can avoid zone surcharges, pink transfer gates are installed, allowing for free transfers and cheaper routes. Think like at 69th St. or Fern Rock, here.
3. Fare cap. Right now, SEPTA wants NPT to have a trip cap--200 a month. Asides from "unlimited" cards getting in trouble with laws and stuff about false advertising, this is rather the wrong way to go about capping. Instead, cap fares. Oyster caps fares at a peak (or off-peak) (round-trip?) ticket of the highest fare used during that day. Since most London transfers are free, this (incidentally) caps Michael Noda's Upper Darby trip at $5.00 (assuming NHSL round trip, $0.50 "premium", and round trip fare capping) or $7.00 (assuming 123 round trip, $1.50 "premium", and round trip fare capping). His hypothetical fare peak at $11.50 would cease to exist.

Keep in mind the fare capping system I am proposing caps fares at the most expensive single round trip fare used. So if Mr. Noda went to Upper Darby but caught the 104, the fare cap would remain at $4.00 (since both the El and 104 within Upper Darby Township charge a $2.00 cash fare).

Of course, the problem of excessive "premium service" cost for the 123 remains, but a fare capping system makes it more bearable.

4. Make it easy, make it easy, make it easy. This needs to become a mantra. Make it easier on the user, make the system more transparent, and don't unfairly penalize folks who don't have a card. On the other hand, make it easy and natural for everyone to have a card--much like the average New Yorker's wallet has an MTA card, and the average Londoner's an Oyster Card.

Monday, April 8, 2013

A Tempest in a Teapot

I must admit, I was wrong. Full of sound and fury, signifying nothing.

Some time ago I went on a rant about how SEPTA and PATCO need to coordinate fare media. They do; so do SEPTA and DART, SEPTA and NJT, and NJT and PATCO (I do not think any NJT route goes over the Delaware Memorial Bridge).

My mistake is that I had assumed--based on very old information--that the Freedom Card had been built on an open platform. It is not. It is built on the same closed-source platform e.g. London's Oyster Card is.

By contrast, SEPTA's NPT is to be built on an open platform--and this, incidentally, will make it first in the nation to be--and so requiring it to be compatible with a closed system is significantly more technically difficult than the examples I've given previously, both here and on Michael Noda's blog. This does not absolve SEPTA completely--you can totally run (closed source) Microsoft Office on (open source) Linux running Wine, for example--but there's a second development that makes me wonder.

PATCO is jonesing about replacing its existing Freedom Card architecture. That makes me wonder: 1. Freedom Card, as it is, is all of five years old, hardly enough time to become technically obsolete (unless, you know, you're Microsoft or Nintendo), and 2. a fairly straight port of Oyster Card technology--you know, the same Oyster Card that is the model of how to do (nearly) everything right. But the news that PATCO is jonesing to replace Freedom, coming out as it has in the thick of NPT, strongly suggests to me that that move isn't meant so much to replace Freedom per se as it is migrating the Freedom architecture onto something compatible with NPT's open-platform architecture.

I'll repeat: the mistake I made was assuming Freedom was open-platform. If it was, that would put compatibility onus on SEPTA. But it isn't, and since SEPTA's NPT is to be open, that puts compatibility onus on PATCO. And from what I've heard, PATCO is being proactive about it. Thankfully.

Monday, March 18, 2013

The Outsize Value of Fare Coordination

or, why NPT and the Freedom Card need to be compatible

a working paper à la Nate Hood

"Organization before electronics before concrete" is an important German concept that refers to both a means of subdividing solutions and a philosophy for applying those subdivisions. The best solutions have the most impact for the money, after all, and the ones that have the most impact are generally those that cost the least to implement properly. Note adverb: Cheapskate "solutions" generally tend to fail. Since we are looking at proper solutions, and it follows that those with the highest cost-benefit ratios tend to be optimal in any circumstance, this means that "organizational" solutions, with an extremely low capital cost* relative to benefits. Because of this, fare coordination is an essential organizational problem, and one which, when implemented properly, contributes massively to systemwide user-friendliness.

This can be directly applied to SEPTA's NPT travails. User desires for NPT are fairly simple--one card to get where you're going, no matter on what or when. One card for any train to Trenton, Wilmington, Downingtown. One card that connects to PATCO and the River Line. One card that does it all. London's Oyster system is a template.

Why is it so hard to just follow a goddamn template?

SEPTA's working protocol for NPT is generally commendable: contactless, open-loop, easily integrated with next-gen credit and debit cards^ like Tokyo's Suica as well as other next-gen fare systems. But that's where its technical edge comes to an end: NPT is attempting an (untested) rollout of Regional Rail fare payment that is not at all in accord with the best templates (e.g. Oyster, which uses a modified proof-of-payment system)--something which I'm sure Sic Transit Philadelphia will give more info on in the near future--and a total failure to integrate the Freedom Card. To hell with fare coordination! sayeth 1234 Market. We want to protect our agency turf at all costs!

Integrating the Freedom Card is basic fare coordination. While it may be more limited than what SEPTA has in mind with NPT, it is not so limited as needing to be back-compatible with tokens. Like what NPT will be, the Freedom Card is also contactless, chip card-based, credit- and debit-card-integrated. It already has features SEPTA has in mind, and was designed to be open-ended enough to be compatible with NPT, predictable since NPT itself is something that has been kicked around for the better part of a decade now. It is Universal Gravitation to NPT's General Relativity. Any implementation of NPT in a fixed-fare environment (buses, trolleys, the subway, el, and NHSL) is going to act, technically, in the same manner as the Freedom Card. So take it as the technical base, and build a variable-fare system on top that works like the Oyster Card! Or, at the very least, make sure it has basic back-compatibility--something that all software developers know full well. It is not hard.

And the users will thank SEPTA. Suddenly, instead of having several agencies at cross-purposes with one another, and discrete fare payment media to match, a single card becomes a gateway to the region. Want to visit the Mercer Museum? No problem! Want to visit a friend in Burlington? No problem! Want to check out that trendy place that just opened in Haddonfield? No problem! It is because, once implemented, fare coordination provides these real, tangible user benefits that even the handful of primitive fare coordination systems in use in the U.S. are expansionary--the Clipper Card, growing at a rate of two agencies a year, for example, or the SmarTrip/CharmCard nexus, which has effectively tied together a fare-coordination network spanning two major cities (Baltimore and D.C.) and the better part of two states. It is because of this that there is only one fare media--the OV-Chipkaart--in use anywhere in the Netherlands. Build a core and other agencies (especially smaller ones which see more significant boosts) will want to climb on.

The point is that while more advanced fare payment systems are more advantageous to the transit agency, fare coordination is more advantageous to the user. And user advantageousness is what, frankly, makes or breaks borderline users, what drives ridership up--or down. SEPTA is not so large as to serve the entire Philadelphia region the way the MBTA is to Boston. If SEPTA truly wishes to make getting around the region using its services advantageous, it must make sure its connections with the regions' other agencies are also advantageous to the user. It must invest in fare coordination.

Unfortunately, it says a great deal about American mass transit that agencies here are obsessed not with implementing proven, and working, templates, but rather with inventing new "standards" that are optimized for themselves and themselves alone (and thus not really standards). All SEPTA has to do with NPT is implement an Oyster Card clone**. Alas, if they keep on the course they're going, they're going to botch it.
____________
* Organizational solutions usually also have relatively high human cost, because the nature of such solutions is that they require agency cooperation and/or integration, a difficult proposition in the U.S. environment where agency turf issues rule the roost. Regulation--requiring all agencies serving a particular metropolitan area to be fare-coordinated--may be a useful workaround, but on the other hand the integration of fare payment media with credit cards (already happening in Europe and Japan^) may well render the whole fare-coordination issue obsolete.
^ For example, D.C., where the SmarTrip system (itself compatible with MTA's CharmCard) is about to be phased out for a credit card-based payment system.
** See e.g. the YouTube link above for why.

Thursday, February 23, 2012

A House Divided

In the news today, SEPTA's head, Joe Casey, is blasting the House Transportation bill. The problems with this bill are well known.

Now, the bill is in one sense obvious political posturing. It is impassable in every sense of the word--no Democrat in their right mind would possible vote in favor of it. It is a transportation bill as the ultra-regressive Tea Partiers would see it. It completely ignores major changes in transportation demands occurring among younger Americans. It would benefit one constituency and one constituency only--the Tea Party's core constituency--to the exclusion of all others.

But, in another sense, it is denial. Active denial. A willing ignorance, a nostalgia that we can return to the 1950s.

The reality? We can't. The United States passed peak oil availability in 2005. Vehicle miles traveled, unsurprisingly, peaked at the same time. We just lived through one oil price shock--in 2007-8--and are ramping up to another one. This is something the new generation gets, in a very visceral sense, and whenever possible they're choosing to live where there's no need for a car to get through the day.

This is our voice, a voice missing from the Tea Party and this boondoggle bill: we want, and demand--to the point that many cities now have powerful lobbies for them--bike lanes. We prefer taking mass transit. We usually have more than one thing going on at a time, job-wise, and time is precious. Too precious to be spent driving an hour or more every day.

And those of us who have decided to learn about how our transportation system works, who want to work for it, also know that our roads far, far overbuilt relative to how much we can spend maintaining it, while everything else is utterly opposite.

We know that the only way to reduce driving is to make driving less necessary and less convenient. And so the House transportation bill is utterly antithetical to our needs.

Monday, January 16, 2012

Looking at SEPTA

Lately, Alon Levy of Pedestrian Observations has been taking a long, hard look at the MBTA commuter rail operation and came to the conclusion that most of the MBTA's plans to expand the physical scope of its operations were misguided. Instead, his suggestions were to maximize the efficiency of the existing operations, primarily with the use of electrification and infill stations, likely with a long look toward uniting the disparate networks operating out of North and South Stations (although the long-term aftereffects of the Big Dig boondoggle will make that unlikely for a generation or more). SEPTA took the same approach with its Regional Rail network thirty years ago, as I pointed out in the comments, and there is no clear evidence it worked better or worse. In any event, however, I want to undertake the same kind of analysis as Alon's, looking mostly at PA (NJ is another story altogether).

This analysis will start along the lower Delaware and work more-or-less clockwise.

1. The Wilmington-Newark Line happens to be one of the three commuter rail lines that also utilizes high-speed designated lines. Since SEPTA has not relocated its stations to park-and-rides on the urban fringe, and since the Marcus Hook local works together with the local and express trains to Wilmington and Newark as well as the express Northeast Regional and Acela trains (which stop at Wilmington), service on this line is adequate--1 tph at the worst; 4 tph at rush hour. Wilmington is intercity, however; a little dinky service between Marcus Hook and Newark may be called for to handle local service there. East of Island Avenue this line operates exactly halfway between the two closest-together branches of the Subway-Surface trolley network.

2. The Airport Line, SEPTA's newest line, suffers from underridership (as do most airport lines that only serve airports). Not helping this one bit is the Airport approach this line takes, a massive fishhook. A new Airport approach would be useful, shortening and speeding up the line; commuter service would return to the line at Eastwick (and if high-speed rail is desired along an Airport routing, a little further to the east as well). Service would be returned to the original routing (IIRC the Reading Chester Branch) via a viaduct over PA 291 (Governor Printz Bvld./Industrial Hwy.) with a stop in Essington before interlocking with the NEC just west of Eddystone.

This also offers a new service paradigm for expresses, and also creates a problem with two local services both heading toward a natural terminus in Chester; one of these (the Airport one, it would have fewer stops and thus reach Chester faster) can be valved up the Chester Creek Branch--which has just begun a rail-trail conversion--to about Aston; any further would overlap with the West Chester Line (etc.: see below) complex. Bringing heavy rail to the Airport would be a wise idea--it's an employment hub. If this happens, heavy rail can use the existing Airport stations and the current I-95 viaduct for end-of-line storage (if desired) while commuter rail--and possibly high-speed rail--would have a concentrated stop at one station as close to the middle of the concourse as possible.

Finally, the current Airport Line junction with the NEC is inferior, and particularly so if a high-speed routing is desired; the technically superior routing would go straight up the Chester Branch past the interlocking with the CSX main and (under, most probably) the CSX cutoff between its main and the High Line. Infill stations would be desirable--at the Post Office, 63rd St., and Bartram's Gardens would offer the greatest balance between distance, jobs access, and residential access.

3. The Media/Elwyn Line displays the core problem with SEPTA Regional Rail: it has lost service since 1980, when the diesel lines were all shed, with one exception. Current service terminates at Elwyn, which is in the middle of nowhere (technically on the outskirts of Media) and has no park-and-ride. As you can expect, the ridership there is low.

This is not, however, the historical state of things. This line is known as the West Chester Branch, and for good reason: it goes to West Chester. Rails still exist all the way to West Chester. The West Chester Railroad serves freight customers along this line. It was electrified all the way to West Chester; the catenary poles still exist.

Of course, at the end, service was highly infrequent, and the lack of maintenance along the line made for a bumpy ride. SEPTA terminated commuter service to West Chester and beyond Paoli in the late '80s, and then offered a choice to Chester County, so the story goes, which to reopen.

However, West Chester is a natural terminus, and would draw reasonable ridership. The line passes by two schools (West Chester and Cheyney Universities), and the area this extension covers is still a core Philadelphia commuter market. Service on such a line should be hourly at the least (although service on all existing SEPTA lines is hourly at minimum already).

4. The Octoraro Branch refers to a disused route splitting off from the West Chester Branch around Lima and heading west to Kennett Square and eventually Nottingham via Oxford. The line east of the Brandywine Creek was apparently washed out in 1977 and has lain abandoned since; to the west, it is operated by the East Penn Rwy., a short line running several spur operations within the Philadelphia area and Lehigh Valley. Freight traffic runs all the way to the Herr's snack food plant in Nottingham, close to the Maryland border; at one point, this route connected into the Northeast Corridor via a Susquehanna River sub, and would have functioned as an alternative freight gateway for the PRR.

Kennett Square is an agricultural job center, and Lincoln University, a bit further on, offers a ridership draw. Additionally, the route passes Chadds Ford, a major regional draw (the home of Longwood Gardens and the Brandywine Museum). Finally, there is no direct highway route from the Chadds Ford area to the city. A good case can be made for hourly trains to Kennett Square, with bihourly trains to Oxford (Lincoln University).

5. The Newtown Square Branch is an old PRR branch serviced by diesels; service beyond Grassland (Eagle Road, perhaps? If anybody knows anything more, can they fill me in?) stopped in 1963, and all service terminated in 1981. Commuter traffic on this line was light for much of its history; it competed with a rather more direct trolley line running down West Chester Pike. Reinstating this trolley service (now Rt. 104) should be prioritized. However, this does not mean that this route should be allowed to decay away (as has been happening); it needs to be banked for the long term, and those parts that have already been lost returned to it. A rail-trail would be the most beneficial option here--the banking is a just-in-case if light rail along West Chester Pike ever reached saturation.

6. The Paoli/Thorndale Line is the second of the three Philadelphia-area commuter lines along high-speed designated corridors; the fastest express service is the Keystone Service, a push-pull utilizing AEM7s, Amfleet coaches, and ex-Metroliner EMUs converted into cab cars. Service right now terminates at Thorndale, which, like Elwyn, is in the middle of nowhere; the natural terminus for this line would be Coatesville (Thorn Interlocking allows turning; a Coatesville or Parkesburg terminus would need to turn all the way out at Lancaster. IIRC, there is a project to improve Parke Interlocking; if this allows for turning, this would make Parkesburg the natural operations terminus of this line).

One of the issues of this line, however, is that it's starting to venture into intercity territory. Lancaster is the main commuter market beyond Coatesville; the least frequent of all trains are the ones beyond Malvern (the "Paoli Local" terminus), the only ones on SEPTA's system which have bihourly frequency.

7. The Cynwyd Line is too damn short. Service needs to be extended to at least a park-and-ride off the Schuylkill Expressway, or possibly Ivy Ridge (where it was in 1986). If extended to Ivy Ridge, a connection could be made with the Manayunk/Norristown Line, thereby increasing service flexibility upstream.

8. The Manayunk/Norristown Line has much higher ridership today than in 1986, when it split riders with the Ivy Ridge line. Extensions of this line to Reading have been on and off the drawing boards for the past twenty years; the Schuylkill Valley Metro disaster basically sunk all of SEPTA's expansion plans for the past decade. Such a route to Reading would, however, be intercity; the natural termini beyond Norristown are Phoenixville and Pottstown, to which extensions can come in that order. Add to that that the line has plenty of capacity, while its primary competitor (the Schuylkill Expressway) is famously ever over-capacity, and this route has some of the region's better potential. This is also the passenger line that comes closest to King of Prussia; unfortunately, it does so in the middle of a giant office park. Perhaps shuttle services can help alleviate the problems that come with that.


9. The Perkiomen Branch saw its last service way back in the 1950s but suburban growth (sprawl) since means that service to Collegeville, with the built-in ridership boost its name suggests is there, and eventually the East Greenville-Pennsburg-Red Hill area. The major problem with this is that this line has been broken in numerous places, including in one place for a golf course (!). That area, however, is much more a part of the Allentown commuter market; a Collegeville spur would make for a better rail restart option.

10. The Chestnut Hill East and West Lines are two semi-overlapping commuter rail lines entirely within the Philadelphia commuter market. Their major problems stem from their infrastructural heritage; Chestnut Hill West has a queerly roundabout routing from North Philadelphia into Center City courtesy of its PRR heritage.

The best fix would be maintain one as commuter rail and convert the other into heavy rail. The usual proposal would be to maintain Chestnut Hill East as commuter rail because it enters the SEPTA Main Line at Wayne Jct., while converting Chestnut Hill West into heavy rail, entering the Broad Street Line around the North Broad/North Philadelphia transit node.

However, this has some major disadvantages: (1) while CHW has that roundabout Center City gateway, its routing north of that is straighter and therefore preferable for commuter rail, and its corollary, (2) CHE is much curvier, and (3) CHW passes mainly through residential areas while CHE comes quite close to Germantown--a major commercial artery--several times.

Combining this with my proposal that my Society Hill-Mt. Airy Line conception, we get a different idea, however. With a 19th St. subway to Wayne Jct., we can use Chestnut Hill East as a heavy rail routing and, with a Swampoodle Connection linking Chestnut Hill West into the SEPTA Main Line, give that line much more direct Center City service. Converting CHE to heavy rail furthermore has the advantage of giving us equipment that can better handle, and in the long run, a superior technical framework for eliminating the sharpest of, that line's curves (Wister Woods and Germantown). This routing also gives us a route that is better equipped to be extended--to Chestnut Hill College, another natural ridership generator a mile away--say. Note: Stenton and Ivy Hill are both definitely underserved by the current options. I may have more ink to spill on that later.

11. The Lansdale/Doylestown Line is the core route of the SEPTA Main Line, and one of the busiest on the Reading side. However, Lansdale, while a major North Penn area center and a natural terminus, is not the natural terminus. Service originally extended to Bethlehem and occasionally Allentown; were local service extended up to the North Penn area's other natural termini (Perkasie and Quakertown) and Bethlehem service extended, (service extension to Perkasie is currently being studied; the relatively bare-bones idea is upgrading the tracks to ridable condition and electrifying the line while utilizing existing infrastructure for stations (to be upgraded later), and extending Lansdale locals) Lansdale would be quite a busy rail junction, leading us to...

12. The Stony Creek Branch, a freight cutoff between Lansdale and Norristown. The primary attraction of this line is service to Merck, which lies right on it; with a busier Bethlehem Branch beyond Lansdale, it would also function as an express cutoff avoiding traffic snarls downstream (particularly in the busy two-track section between Jenkintown and Wayne Jct.)

13. The Warminster Line is the line that currently best accesses the part of Philadelphia's northern commuter market with the worst highway access, and hence has high ridership. Beyond Warminster the line continued as the New Hope Branch, today the New Hope & Ivyland Railroad. This route should be extended to a natural terminus at Ivyland; the next one up is New Hope, which, while a regional draw, would require too extensive an electrification to be viable until better routes are dealt with.

14. The Newtown Branch (part of which is the Fox Chase Line) was the last diesel commuter rail line SEPTA operated, ceasing service in 1983, after SEPTA had run its RDCs into the ground. While the Warminster Line passes Willow Grove, the Newtown Branch has, in aggregate, the best rail route in the northern suburbs' commuter rail market. Warminster Line saturation also suggests it's time to invest in it once again. PA-TEC has an ingenious (if rather park-and-ride heavy) plan to extend service to Huntingdon Valley, a key foot in the door for actual Newtown Branch line restoration--the line's natural terminus is Newtown itself. The Newtown Branch crosses the New York Branch at Ayres Interlocking in Beth Ayres.

15. The West Trenton Line follows the New York Branch from Jenkintown east. At Beth Ayres it crosses the Newtown Branch; it terminates at West Trenton in Ewing Township, another of those stations with nothing around it. For whatever reason, the Reading chose to terminate its Philadelphia commuter service here, and the infrastructure needed for it hence still exists. It is an operational terminus: Yardley is the more natural terminus. Since it's already in New Jersey, two possibilities can be considered: extend it to NJ Transit, or extend NJ Transit down to it, with a shared terminus at Yardley. Such a route would be considered part of the Raritan Valley Line (and short of its electrification there is no good reason to extend SEPTA service to Bound Brook).

16. The New York Short Line is a freight cutoff between the Newtown Branch and the New York Branch with some useful passenger rail possibilities. West Trenton trains using the NYSL would eliminate the need to go through Jenkintown, thus saving time; it would also avoid needing to reinstate the level interlocking at Ayres and send potential Newtown Branch trains through Jenkintown. An unfortunate byproduct of this idea, however, is that it would eliminate service to Philmont, Forest Hills, and Somerton stations. However, an NYSL express cutoff is still a useful idea: West Trenton express trains run local beyond Trevose (which is where the NYSL-West Trenton Line interlocking is).

17. The North Penn Sub, as I recall its name, is the route extending from Fern Rock south, principally along American Street. It was originally the North Penn R.R.'s mainline--hence its name. The entirety of the ROW still exists; a smart move may be to bring light rail service up it, especially if new light rail service is to go along Delaware Avenue (although that is not the smartest proposition right now).

18. The Bustleton Branch is a short branch between Holmesburg Jct. and the Bustleton area. While the section north of Roosevelt Bvld. has been obliterated, the portion south is still intact, and a spur heads from it to Northeast Philadelphia Airport. This is minor expansion written all over it, and would make a good terminus area for a local service from the interior of the Trenton Line. It would also be helpful to extend a spur from the NYSL to this branch, as the current setup forces the not-inconsiderable amount of freight traffic generated here onto the NEC.

19. The Trenton Line--at last!--is the NEC's route north from Philadelphia and is hence the third high-speed designated line in the city. It has sharp curves at Zoo Interlocking and Frankford Jct.; as I've noted before, there is no cost-effective way to do something other than put up with Zoo as the junction between the NEC and Keystone Corridor; for true high-speed service, a Frankford Jct. cutoff along Torresdale Ave. can be arranged. (A little concrete is better than a lot.) Trenton trains are reasonably frequent, and timetables for this line also include a section of the connecting NJT Penn Line timetable to New York--a rare manifestation of organizational competence in the passenger experience. So rare is it that the two can't even be bothered to time their trains for cross-platform transfers! Or accept one another's tickets!

Infill stations should be considered along the Trenton Line, particularly at Brewerytown, Fairhill, and Juniata Park.

Commuter rail in Philadelphia is a different animal than in Boston. Where in Boston concentrating on optimizing existing service would be more useful than less and less tenuous greenfield extensions, in Philadelphia, development and larger towns tend to exist beyond the edges of existing lines. I hope to get a map of these ideas going; additionally, I would like to see what kinds of service patterns would optimize our resources.

Wednesday, July 27, 2011

Rt. 17

The proposal I'm putting forward is a simple one--consolidate the 17 and 33 into a single new route, eliminating the current Market East jog both take in favor of connections offered to the Market Street buses at Market and JFK. This route would run service at a 15-minute headway and would be, like the 2, 7, 23, 47, 57, and C buses (and Broad Street Line and Philadelphia2050's proposed Loop Network) part of a frequent service core in the, er, urban core.

Consolidating this service would still allow for connections to other core frequent services at Cecil B. Moore (3), Girard (15), Spring Garden (43), Market/JFK (10, 11, 13, 34, 36, and the MFL), Chestnut/Walnut (21, 42), and Lombard/South (40)--as well as possible frequent service route modifications along Race/Arch (31, 48) and Spruce/Pine (12, 30), and expanded light rail service along Girard (37 proposal) and Washington (49, 64) (see here). The bus sections of this proposal can be implemented with relatively minimal cost: putting out a new schedule and map, and putting up new bus station signs; the buses (and drivers) taken off the now-defunct 33 would go to augment some of the more poorly bused routes in this network (mostly east-west).

Sometime in the near future I'm thinking of showing a map of this (unwieldy-named) Core Frequent Bus Network and connections, in the contexts of both current, and suggested Philadelphia2050, operations.

Sunday, June 5, 2011

Wayne Junction Work

 See this Newsworks article.

It is a fairly status-quo SEPTA project, converting low-level platforms to high-level ones, but the total project includes a restoration of the historic headhouse (the white building in the center of the picture). Of note is the idea to raise the floor level within the headhouse to bring it to the new platform level.

Wayne Jct. is a key Regional Rail hub, and given local developmental opportunities (see this link [PDF]), this is a project that needs to be done yesterday. Densification and upzoning around train stations--except where deliberately designed otherwise--needs to be a key goal of 21st-century public transit.

Thursday, June 2, 2011

TransitView Goes Live

TransitView screenshot, 5:45 PM, 2 June 2011
Check this out. It's the 10 trolley on SEPTA's new TransitView technology. Just gone live a few days ago, it allows anyone to track any bus, trolley, or trackless trolley real-time with GPS data. This is something even the MTA is still piloting.

SEPTA, I have to give you props. You may still not have real-time subway information at your stations (seriously, how hard is it?) but between the real-time information available at (many) Regional Rail stations and on the web, and this TransitView technology, planning a mass-transit trip in Philadelphia, and compensating for late buses, is now easier than ever. In fact, it might now be easier here to coordinate across modes than anywhere else in the U.S.

Notice, by the way, that the URL is http://www3.septa.org/transitview/###. Switch out ### with whatever route you want information on (10, 17, 65, 99, whatever*) and you can easily toggle between routes on TransitView just using your browser's URL bar.

Let's pop in on this link too, soon. It's not quite live yet, but when it is, it'll rock. Tip to Temple students: remember stop IDs 1277, 16111, and 5328. These are the stop IDs for Center City-bound routes from Main Campus: 1277 is Cecil B. Moore station, 16111 is 12th and Berks (23), and 5328 is Broad and Berks (C).
__________
* Caveat: I'm not getting it to work with lettered routes (C, G, L, H, XH) right now.